PLANNING NOTE / 03
Pivot door cost.
Know what is included.
A custom door is priced as an assembly.
Compare the same specification and supply scope.

A PROJECT-SPECIFIC QUOTATION
More than
a price per door.
The image, the opening dimensions and the installation conditions define different parts of a pivot entrance. Price depends on the construction, finish, hardware and components selected for that entrance.
We do not publish a universal starting price for every configuration. A useful quotation states the agreed dimensions, included components, packing and delivery scope, so comparisons can be made on the same basis.
Request a project quotationWhat changes
the quotation.
| Item | What to confirm |
|---|---|
| Door size & weight | Larger dimensions can change the construction, hardware selection, handling and packing requirements. |
| Leaf & frame construction | Compare the complete build-up, insulation, thermal-break requirements and frame arrangement. |
| Surface & finish | Plain, wood-effect, patterned and mixed surfaces may involve different processes. Confirm the finish sample and which faces are included. |
| Hardware & access | Pivot system, closing controls, handle, lock and any smart-access requirements must be identified by model or agreed specification. |
| Glazing & fixed panels | State whether sidelights, toplights, glass and their frames are included or quoted separately. |
| Quantity & production | Confirm quantities, repeated specifications and the required schedule. Production timing is agreed for the actual order. |
| Packing, freight & destination | Compare protective packing, transport, insurance, destination charges and delivery responsibilities, not only the door price. |
02 / COMPARE LIKE FOR LIKE
A clearer quote.
Fewer assumptions.
What does the door price include?
Identify the leaf, frame, pivot hardware, lock, handle, threshold, seals, glazing and any fixed panels. Ask which components arrive installed and which require site assembly.
Who handles the journey?
Agree the named delivery place and the applicable trade terms. Confirm responsibility for freight, insurance, customs, taxes, unloading and final-site transport.
Who installs the entrance?
Clarify whether the offer is supply only and who provides local installation, structural preparation, drainage and final adjustment. Overseas supply does not automatically include an on-site installation team.
What is needed for approval?
Keep drawing revisions, finish samples, hardware, required evidence, lead time and warranty terms with the quotation. Any change should be reflected in the final agreed specification.
03 / YOUR ENQUIRY
A reference.
An opening. A destination.
Send the design reference, opening width and height in millimetres, quantity, finish direction and destination. Add an elevation or site photograph, required performance evidence and the preferred supply scope.
Prepare your project enquiry